

After the wall is restructured the new framing is built. The outside gets 1/2" exterior grade plywood and a layer of RainDrop drainage plane. The contrators carefully cut the drainage plane and wrap it around the structure. Then the windows go in, nailed and caulked around the nailsheads.

No comments:
Post a Comment