Friday, April 24, 2009

Day 154

Today was a big day for the radiant floor. Todd got the pumps going and the boiler controller programmed with the help of Rood Utilities. The sensor in the passage near the studio relays the temperature to the boiler control.
After the radiant floor is working for a while we can install the flooring in the radiant areas.
Does anyone know what that little umbrella on the sensor means? (I'll ask Todd when he comes back.)



No comments: