Thursday, February 19, 2009

Day 119 - Warmboard installation

Tom adds the last of the insulation, two sheets of R10 = R20 under the Warmboard, which requires a minimum of R19 under the plywood.
Zack watches the alignment the board.













Todd measures to place the TileRedi shower base drain in the right location before drilling through the Warmboard. We're hoping to miss the grooves where the PexAlPex tubing will go to avoid routing the tubes around the hole.

No comments: